7-year contract for CIS BIO INTERNATIONAL: SANITATION AND DISMANTLING OF INB 29 (FRANCE),
1- to 2-year contract for CIS BIO INTERNATIONAL: REMOVAL AND REPLACEMENT OF B1-B2-C1 AND C2 TANKS AT INB 29 (FRANCE),
1- to 2-year contract for CIS BIO INTERNATIONAL: REMOVAL OF A1-A2-I1 AND I2 TANKS AT INB 29 (FRANCE),
3-year contract for CEA SACLAY: DISMANTLING OF TOTEM ARMOURED LINE – INB 49 (FRANCE),
2.5-year contract for CEA CADARACHE: DISMANTLING OF UNUSED EQUIPMENT FROM BUILDING 241 BSM AT INB39 MASURCA (FRANCE),
3.5-year contract for CEA MARCOULE: DISMANTLING OF BENCH XIV BIS – UP1 MARCOULE (FRANCE),
3-year contract, at the CEA in PIERRELATTE: DISMANTLING OF THE ERV (FRANCE),
4-year contract, at EDF UTO in Tricastin: DISMANTLING OF THE BCOT / EDF UTO WASTE (FRANCE),
4-year contract, at the IRSN in FEURS: SANITATION OF THE IRSN PREMISES FEURS (FRANCE),
2-year contract, at the IRSN in FEURS: SANITATION OF BUNKER 3 IRSN FEURS (FRANCE),
Over 10-year contract, at the CEA MARCOULE: STUDY, CONSTRUCTION, AND OPERATION OF THE EBZN FACILITY - CEA MARCOULE (FRANCE)